四级冲刺练习阅读47

雕龙文库 分享 时间: 收藏本文

四级冲刺练习阅读47

  The greatest fear of nuclear power opponents has always been a reactor meltdown. Today, the chances of a meltdown that would threaten U. S. public health are very little. But to even further reduce the possibility, engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But dont expect them even on U. S. shores unless things change in Washington.

  The procedure for licensing nuclear power plants is a bad dream. Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice-but-not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway.

  A case in point is the Shoreham plant on New Yorks Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid-60s. Millstone, completed for $ 101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $ 5 billion and delayed its use for many years.

  Shoreham finally won its operation license. But the plant has never produced a watt power. Governor Mario Cuomo, an opponent of a Shoreham start up, used his power to force New Yorks public-utilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant. Ioday, a perfectly good facility, capable of servicing hundreds of thousands of homes, sits rusting.

  21.The authors attitude toward the development of nuclear power is______.

  A. negative B. neutral

  C. positive D. questioning

  22.What has made the procedure for licensing nuclear power plants a bad dream?

  A. The inefficiency of the Nuclear Regulation Commission. B. The enormous cost of construction and operation.

  C. The length of time it takes to make investigations.

  D. The objection of the opponents of nuclear power.

  23.It can be inferred from Paragraph 2 that______.

  A. there are not enough safety measures in the U. S. for running new nuclear power plants

  B. it is not technical difficulties that prevent the building of nuclear power plants in the U. S.

  C. there are already more nuclear power plants than necessary in the U. S.

  D. the American government will not allow Japanese nuclear reactors to be installed in the U. S.

  24. Governor Mario Cuomos chief intention in proposing the settlement was to_______.

  A. stop the Shoreham plant from going into operation

  B. urge the power company to further increase its power supply

  C. permit the Shoreham plant to operate under certain conditions

  D. help the power company to solve its financial problems

  25. The phrase single out is closest in meaning to_______.

  A. delay B. end up

  C. complete D. separate

  21. C 22. D 23. B 24. A 25. D

  

  The greatest fear of nuclear power opponents has always been a reactor meltdown. Today, the chances of a meltdown that would threaten U. S. public health are very little. But to even further reduce the possibility, engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But dont expect them even on U. S. shores unless things change in Washington.

  The procedure for licensing nuclear power plants is a bad dream. Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice-but-not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway.

  A case in point is the Shoreham plant on New Yorks Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid-60s. Millstone, completed for $ 101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $ 5 billion and delayed its use for many years.

  Shoreham finally won its operation license. But the plant has never produced a watt power. Governor Mario Cuomo, an opponent of a Shoreham start up, used his power to force New Yorks public-utilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant. Ioday, a perfectly good facility, capable of servicing hundreds of thousands of homes, sits rusting.

  21.The authors attitude toward the development of nuclear power is______.

  A. negative B. neutral

  C. positive D. questioning

  22.What has made the procedure for licensing nuclear power plants a bad dream?

  A. The inefficiency of the Nuclear Regulation Commission. B. The enormous cost of construction and operation.

  C. The length of time it takes to make investigations.

  D. The objection of the opponents of nuclear power.

  23.It can be inferred from Paragraph 2 that______.

  A. there are not enough safety measures in the U. S. for running new nuclear power plants

  B. it is not technical difficulties that prevent the building of nuclear power plants in the U. S.

  C. there are already more nuclear power plants than necessary in the U. S.

  D. the American government will not allow Japanese nuclear reactors to be installed in the U. S.

  24. Governor Mario Cuomos chief intention in proposing the settlement was to_______.

  A. stop the Shoreham plant from going into operation

  B. urge the power company to further increase its power supply

  C. permit the Shoreham plant to operate under certain conditions

  D. help the power company to solve its financial problems

  25. The phrase single out is closest in meaning to_______.

  A. delay B. end up

  C. complete D. separate

  21. C 22. D 23. B 24. A 25. D

  

信息流广告 网络推广 周易 易经 代理招生 二手车 网络营销 招生代理 旅游攻略 非物质文化遗产 查字典 精雕图 戏曲下载 抖音代运营 易学网 互联网资讯 成语 成语故事 诗词 工商注册 注册公司 抖音带货 云南旅游网 网络游戏 代理记账 短视频运营 在线题库 国学网 知识产权 抖音运营 雕龙客 雕塑 奇石 散文 自学教程 常用文书 河北生活网 好书推荐 游戏攻略 心理测试 石家庄人才网 考研真题 汉语知识 心理咨询 手游安卓版下载 兴趣爱好 网络知识 十大品牌排行榜 商标交易 单机游戏下载 短视频代运营 宝宝起名 范文网 电商设计 免费发布信息 服装服饰 律师咨询 搜救犬 Chat GPT中文版 经典范文 优质范文 工作总结 二手车估价 实用范文 爱采购代运营 古诗词 衡水人才网 石家庄点痣 养花 名酒回收 石家庄代理记账 女士发型 搜搜作文 石家庄人才网 铜雕 词典 围棋 chatGPT 读后感 玄机派 企业服务 法律咨询 chatGPT国内版 chatGPT官网 励志名言 河北代理记账公司 文玩 朋友圈文案 语料库 游戏推荐 男士发型 高考作文 PS修图 儿童文学 买车咨询 工作计划 礼品厂 舟舟培训 IT教程 手机游戏推荐排行榜 暖通,电采暖, 女性健康 苗木供应 主题模板 短视频培训 优秀个人博客 包装网 创业赚钱 养生 民间借贷律师 绿色软件 安卓手机游戏 手机软件下载 手机游戏下载 单机游戏大全 免费软件下载 网赚 手游下载 游戏盒子 职业培训 资格考试 成语大全 英语培训 艺术培训 少儿培训 苗木网 雕塑网 好玩的手机游戏推荐 汉语词典 中国机械网 美文欣赏 红楼梦 道德经 网站转让 鲜花 社区团购 社区电商